Article image
Article image
Article image
Article image

Waterloo Bridge’s Huge Repair Bill

WORK TO PROCEED British Official Wireless Received Wednesday, 7.0 p.m, RUGBY, Jan. 24. A letter from tho Ministry of Transport was read at -the London County Council meeting to-day which stated that the Government had reached the conclusion to proceed to recondition Waterloo Bridge at an estimated cost of £685,000. A grant of 60 per cent, of the cost is to be made by the Ministry. It is suggested that the question of corbelling should bo referred to the Line Arts Commission.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MT19330126.2.77

Bibliographic details

Manawatu Times, Volume LVI, Issue 7065, 26 January 1933, Page 7

Word Count
87

Waterloo Bridge’s Huge Repair Bill Manawatu Times, Volume LVI, Issue 7065, 26 January 1933, Page 7

Waterloo Bridge’s Huge Repair Bill Manawatu Times, Volume LVI, Issue 7065, 26 January 1933, Page 7