Article image
Article image
Article image
Article image

NEW BRIDGE ACROSS THE HUTT RIVER,—A foot-bridge to replace the Haywards traffic bridge swept away by the floods of Easter, 1931, has now been completed and is open for traffic. It crosses the Hutt river in the vicinity of the Stokes Valley road on one side, and Manor park on the other, and is the only means of crossing the river between the Melling and Moonshine bridges.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MT19320523.2.38

Bibliographic details

Manawatu Times, Volume LV, Issue 6865, 23 May 1932, Page 5

Word Count
67

NEW BRIDGE ACROSS THE HUTT RIVER,—A foot-bridge to replace the Haywards traffic bridge swept away by the floods of Easter, 1931, has now been completed and is open for traffic. It crosses the Hutt river in the vicinity of the Stokes Valley road on one side, and Manor park on the other, and is the only means of crossing the river between the Melling and Moonshine bridges. Manawatu Times, Volume LV, Issue 6865, 23 May 1932, Page 5

NEW BRIDGE ACROSS THE HUTT RIVER,—A foot-bridge to replace the Haywards traffic bridge swept away by the floods of Easter, 1931, has now been completed and is open for traffic. It crosses the Hutt river in the vicinity of the Stokes Valley road on one side, and Manor park on the other, and is the only means of crossing the river between the Melling and Moonshine bridges. Manawatu Times, Volume LV, Issue 6865, 23 May 1932, Page 5