Article image
Article image
Article image
Article image

DIGGING DEEP FOR THE TUNNEL PORTAL.—The height of tho banks above the council’s steam navvy and the figures of the men give a good idea of the depth of the cutting which has been made on the Hataitai side for the approach to tho new tunnel through Mount Victoria. The cutting is now practically back to the point where the actual tunnel will commence.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MT19291108.2.76.1

Bibliographic details

Manawatu Times, Volume LIV, Issue 7061, 8 November 1929, Page 9

Word Count
64

DIGGING DEEP FOR THE TUNNEL PORTAL.—The height of tho banks above the council’s steam navvy and the figures of the men give a good idea of the depth of the cutting which has been made on the Hataitai side for the approach to tho new tunnel through Mount Victoria. The cutting is now practically back to the point where the actual tunnel will commence. Manawatu Times, Volume LIV, Issue 7061, 8 November 1929, Page 9

DIGGING DEEP FOR THE TUNNEL PORTAL.—The height of tho banks above the council’s steam navvy and the figures of the men give a good idea of the depth of the cutting which has been made on the Hataitai side for the approach to tho new tunnel through Mount Victoria. The cutting is now practically back to the point where the actual tunnel will commence. Manawatu Times, Volume LIV, Issue 7061, 8 November 1929, Page 9