Article image
Article image
Article image
Article image

AWAHURI BRIDGE.—The last section of the decking of the new bridge at Awahuri being prepared for the pouring of the concrete. The temporary bridge may be seen to the left.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19380825.2.31

Bibliographic details

Manawatu Standard, Volume LVIII, Issue 228, 25 August 1938, Page 4

Word Count
30

AWAHURI BRIDGE.—The last section of the decking of the new bridge at Awahuri being prepared for the pouring of the concrete. The temporary bridge may be seen to the left. Manawatu Standard, Volume LVIII, Issue 228, 25 August 1938, Page 4

AWAHURI BRIDGE.—The last section of the decking of the new bridge at Awahuri being prepared for the pouring of the concrete. The temporary bridge may be seen to the left. Manawatu Standard, Volume LVIII, Issue 228, 25 August 1938, Page 4