Article image
Article image
Article image
Article image

A BRIDGE AND A HALF AT WATERLOO.—Two temporary structures occupy the site where the new Waterloe Bridge will be. On the right is the steel bridge no w carrying the traffic, and, at left, the span of girders carrying cranes for the construction of the new bridge.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19380321.2.63.7

Bibliographic details

Manawatu Standard, Volume LVIII, Issue 95, 21 March 1938, Page 5

Word Count
47

A BRIDGE AND A HALF AT WATERLOO.—Two temporary structures occupy the site where the new Waterloe Bridge will be. On the right is the steel bridge no w carrying the traffic, and, at left, the span of girders carrying cranes for the construction of the new bridge. Manawatu Standard, Volume LVIII, Issue 95, 21 March 1938, Page 5

A BRIDGE AND A HALF AT WATERLOO.—Two temporary structures occupy the site where the new Waterloe Bridge will be. On the right is the steel bridge no w carrying the traffic, and, at left, the span of girders carrying cranes for the construction of the new bridge. Manawatu Standard, Volume LVIII, Issue 95, 21 March 1938, Page 5