Article image
Article image
Article image
Article image

CLEANING OF DAM.

PREPARATIONS TO RESUME. Preparations are being made by the Palmerston North City Council to again undertake cleaning operations in the basin behind the Tiritea dam. This announcement was made by the engineer (Mr J. R. Hughes) at the meeting of the council held, last evening, when he stated that the work would probably occupy eight or ten weeks. The clearance of silt was suspended with the advent of the warm weather last year, when partly done, and the period in which the work could be undertaken was limited. Cr. H. B. Free said that some discolouration in the city water supply had been noticeable after recent heavy rains, and he asked if the filters had been flushed, as arranged. The engineer replied that all fourteen filters were cleaned every three days under ordinary conditions, and on other occasions after every ‘ heavy rain.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19330905.2.75

Bibliographic details

Manawatu Standard, Volume LIII, Issue 238, 5 September 1933, Page 6

Word Count
145

CLEANING OF DAM. Manawatu Standard, Volume LIII, Issue 238, 5 September 1933, Page 6

CLEANING OF DAM. Manawatu Standard, Volume LIII, Issue 238, 5 September 1933, Page 6