Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

WATERLOO BRIDGE.

WORK OF RECONDITIONING

(British Official Wireless.) RUGBY, Jan.. 24.

A letter from the Ministry of Transport was read at the London County Council meeting to-day which stated that the Government had reached the conclusion to proceed to recondition Waterloo Bridge at an estimated cost of £685,000. A grant of 60 per cent, of the cost would be made by the Ministry.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19330126.2.97

Bibliographic details

Manawatu Standard, Volume LIII, Issue 50, 26 January 1933, Page 7

Word Count
63

WATERLOO BRIDGE. Manawatu Standard, Volume LIII, Issue 50, 26 January 1933, Page 7

WATERLOO BRIDGE. Manawatu Standard, Volume LIII, Issue 50, 26 January 1933, Page 7