Article image
Article image
Article image
Article image

OTAGO FLOODS.

PROBLEM FOR ENGINEER. Per Press Association. DUNEDIN, April 2. The problem ccni renting the city engineer is the removal of some 30,U0U yards of stone carried down the bed of the Leith during the floods, and weighing 40,000 tons. Tne relief fund now totals £4OBO.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19290402.2.67

Bibliographic details

Manawatu Standard, Volume XLIX, Issue 104, 2 April 1929, Page 7

Word Count
47

OTAGO FLOODS. Manawatu Standard, Volume XLIX, Issue 104, 2 April 1929, Page 7

OTAGO FLOODS. Manawatu Standard, Volume XLIX, Issue 104, 2 April 1929, Page 7