Article image
Article image
Article image
Article image

THE NELSON DRAINAGE SCHEME.

Press A ssoctotion. Electric Telegraph Copyright. Nelson, September 18. In view of the rejection of the Mestayer drainage scheme by the ratepayers on. the ground of a needed extonai n of the septic effluent to deep water and the cost of the connections, the Citizens' Drainage Committee formed to conduct; the recent poll met last night. A representative gathering ros lved unanimously to recommond tho City Council to amend the scheme in tho direction of deep water efllu«nt and an equitable method with regard to the cose of connections — the objection to the original scheme. They guaranteed to support the reformed project. It is probable an amended scheme will be submit! Ed to the ratepayers at an early date, after consultation with. Mr Mestayer as to extending his septic tank proposals in tho directions indicated.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MEX19030919.2.7

Bibliographic details

Marlborough Express, Volume XXXVII, Issue 222, 19 September 1903, Page 1

Word Count
139

THE NELSON DRAINAGE SCHEME. Marlborough Express, Volume XXXVII, Issue 222, 19 September 1903, Page 1

THE NELSON DRAINAGE SCHEME. Marlborough Express, Volume XXXVII, Issue 222, 19 September 1903, Page 1