Article image
Article image
Article image
Article image

HYDRO-ELECTRIC POWER.

TUB UNITED PRESS ASSOCIATION. OHKISTOHURCH, May 15. Work on the Lake Coleridge hydroelectric scheme is proceeding steadily The tunnel is in 200 ft and is 60ft fro n the main ventilating shaft, which is now down to 64ft. The water supply is well forward. The excavation for the reservoir is proceeding.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/ME19120515.2.42

Bibliographic details

Mataura Ensign, 15 May 1912, Page 5

Word Count
53

HYDRO-ELECTRIC POWER. Mataura Ensign, 15 May 1912, Page 5

HYDRO-ELECTRIC POWER. Mataura Ensign, 15 May 1912, Page 5