HYDRO-ELECTRIC POWER.
TUB UNITED PRESS ASSOCIATION. OHKISTOHURCH, May 15. Work on the Lake Coleridge hydroelectric scheme is proceeding steadily The tunnel is in 200 ft and is 60ft fro n the main ventilating shaft, which is now down to 64ft. The water supply is well forward. The excavation for the reservoir is proceeding.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ME19120515.2.42
Bibliographic details
Mataura Ensign, 15 May 1912, Page 5
Word Count
53HYDRO-ELECTRIC POWER. Mataura Ensign, 15 May 1912, Page 5
Using This Item
See our copyright guide for information on how you may use this title.