Article image
Article image
Article image
Article image

MINING JOTTINGS.

The Golden Arrow Co. has now commenced elevating at the junction of Bush Creek with Arrow River- A good deal of preliminary work has had to be carried out at this claim. To protect the paddock, from an encroachment of the river should a fresh occur, a wingdam of about MX) yards- bad to be constructed, Hamilton’s claim at Big Beach. Arrow River, has also made a start for the season. As work is now being carried on in a fairly narrow part of the river, a fresh on Tuesday last caused some delay, but elevating has again been resumed.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/LWM19400903.2.18.6

Bibliographic details

Lake Wakatip Mail, Issue 4483, 3 September 1940, Page 3

Word Count
102

MINING JOTTINGS. Lake Wakatip Mail, Issue 4483, 3 September 1940, Page 3

MINING JOTTINGS. Lake Wakatip Mail, Issue 4483, 3 September 1940, Page 3