Article image
Article image

The most costly tunnel in the world has just been completed at Meudon, on the Paris-Versailles electric line. In June, 1900, 110 ft of the tunnel fell in, and it 'has taken two years to repair the damage at a cost of £55,000, or £500. a foot.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/LT19021211.2.85.2

Bibliographic details

Lyttelton Times, Volume CVIII, Issue 12996, 11 December 1902, Page 6

Word Count
47

Page 6 Advertisements Column 2 Lyttelton Times, Volume CVIII, Issue 12996, 11 December 1902, Page 6

Page 6 Advertisements Column 2 Lyttelton Times, Volume CVIII, Issue 12996, 11 December 1902, Page 6