Article image
Article image
Article image
Article image

QUARRY OUTPUT

WORK AT MANGATARATA PRODUCTION DURING MONTH The output for the past month at the Mangatarata quarry was 16261 cubic yards of crushed metal, reported the county engineer, Mr E. Hazledine Barber, to the November meeting of the Hauraki Plains County Council. Distribution: Highways and roads, 1519; sales, 107 i. “Ten one-yard metal spawl trucks have been repaired, the bodies of these trucks requiring complete rebuilding,” added the report.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/HPGAZ19471126.2.22

Bibliographic details

Hauraki Plains Gazette, Volume 56, Issue 32929, 26 November 1947, Page 5

Word Count
70

QUARRY OUTPUT Hauraki Plains Gazette, Volume 56, Issue 32929, 26 November 1947, Page 5

QUARRY OUTPUT Hauraki Plains Gazette, Volume 56, Issue 32929, 26 November 1947, Page 5