Article image
Article image
Article image
Article image

WATERLOO BRIDGE REPAIRS

ESTIMATED £685,000 COST. DECISION TO PROCEED. (Pritish Official Wireless.) RUGBY, Jan. 24. A letter from the Ministry' of Transport read at the London County Council meeting to-day stated that the Government had reached the decision to proceed to recondition Waterloo Bridge at an estimated cost of £685,000. A grant of 60 per cent, of the post would be made by the Ministry.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/HAWST19330126.2.27

Bibliographic details

Hawera Star, Volume LII, 26 January 1933, Page 5

Word Count
65

WATERLOO BRIDGE REPAIRS Hawera Star, Volume LII, 26 January 1933, Page 5

WATERLOO BRIDGE REPAIRS Hawera Star, Volume LII, 26 January 1933, Page 5