Article image
Article image
Article image
Article image

TAUPO POWER SUPPLY

A scheme for a power station at the Huka Falls to provide electricity for Taupo was explained by the chairman of the Taupo Road Board, Dr. S. Armstrong, at a meeting of ratepayers. The scheme would cost £15,000. A water supply scheme for Taupo was also explained at the meeting. The water would be pumped from the Waikato River to a large reservoir on the high levels near Tauhara Mountain. This scheme would also cost £15,000. These schemes arc to be submitted to the ratepayers for approval.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/GISH19390905.2.7

Bibliographic details

Gisborne Herald, Volume LXVI, Issue 20034, 5 September 1939, Page 2

Word Count
90

TAUPO POWER SUPPLY Gisborne Herald, Volume LXVI, Issue 20034, 5 September 1939, Page 2

TAUPO POWER SUPPLY Gisborne Herald, Volume LXVI, Issue 20034, 5 September 1939, Page 2