Article image
Article image
Article image
Article image

ENGINEERING FEAT

FLOW OF WATER, CONQUERED (Per Press Association) Wellington, Sept. G. The flowof water in the Tawa Flat tunnel, which interfered with the construction work last week, wafe got in hand by Sunday and since’ then the pumps have been able to keep pace with the flow, which is now small.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/FS19290906.2.96

Bibliographic details

Feilding Star, Volume 7, Issue 2305, 6 September 1929, Page 8

Word Count
52

ENGINEERING FEAT Feilding Star, Volume 7, Issue 2305, 6 September 1929, Page 8

ENGINEERING FEAT Feilding Star, Volume 7, Issue 2305, 6 September 1929, Page 8