AORANGI BRIDGE
PREPARING FOR THE JOB
Preliminary work is proceeding in connection with, tlie erection of a new railway bridge over fhe Oroua river at Aorangi. The Railway Department are providing flic ballast for the approaches, carting the metal from Kakariki.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/FS19290905.2.18
Bibliographic details
Feilding Star, Volume 7, Issue 2304, 5 September 1929, Page 4
Word Count
41AORANGI BRIDGE Feilding Star, Volume 7, Issue 2304, 5 September 1929, Page 4
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.