Article image
Article image
Article image
Article image

FLOOD PROTECTION SCHEME AT THE GLEN. —Work has been started making a wider channel to carry away the water in the stream which flows into the foot of the Glen. A concrete basin is also to be constructed to catch 'boulders and debris coming down in the event of excessive rain-and thus allow the water to get away unobstructed.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/ESD19400430.2.76.2

Bibliographic details

Evening Star, Issue 23563, 30 April 1940, Page 8

Word Count
59

FLOOD PROTECTION SCHEME AT THE GLEN.—Work has been started making a wider channel to carry away the water in the stream which flows into the foot of the Glen. A concrete basin is also to be constructed to catch 'boulders and debris coming down in the event of excessive rain-and thus allow the water to get away unobstructed. Evening Star, Issue 23563, 30 April 1940, Page 8

FLOOD PROTECTION SCHEME AT THE GLEN.—Work has been started making a wider channel to carry away the water in the stream which flows into the foot of the Glen. A concrete basin is also to be constructed to catch 'boulders and debris coming down in the event of excessive rain-and thus allow the water to get away unobstructed. Evening Star, Issue 23563, 30 April 1940, Page 8