GREY RIVER DREDGE RETURN.
Grey River Dredging Company re)orts:—Digging time, 159 hours 35 linutes; volume treated, 104,367 yards, aade up of 77,056 yards solid gravel nd 27,311 gravel washed in by flood, or 304.10z.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19401101.2.126.4
Bibliographic details
Evening Post, Volume CXXX, Issue 107, 1 November 1940, Page 10
Word Count
34GREY RIVER DREDGE RETURN. Evening Post, Volume CXXX, Issue 107, 1 November 1940, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.