RIMU FLAT GOLD
Rimu Flat clean-up for the week ended June 3: 213.850z from 51,492 yards in .133 hours 47 minutes.
GREY RIVER GOLD RETURN,
Grey River Gold Dredging Co., Ltd., reports a return of 2120z from 46,844 cubic yards worked in 693 hours during the week ended June 5. The total gold recovered during May was 1364.420z from 381,353 cubic yards worked in 558 hours 40 minutes.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19400607.2.105.20
Bibliographic details
Evening Post, Volume CXXIX, Issue 134, 7 June 1940, Page 10
Word Count
68RIMU FLAT GOLD Evening Post, Volume CXXIX, Issue 134, 7 June 1940, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.