The greater part- of the. formation work on the Western Mutt Road is completed, and the abutment formation of the traffic bridge is wdl ahead. As- the photograph' shows, the junction between .the new and the old road will be at a point about half a mile north of the Silverstream railway overbridge, where the river is comparatively;
■ 1;*: - JF^ s^
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19370827.2.37.6
Bibliographic details
Evening Post, Volume CXXIV, Issue 50, 27 August 1937, Page 7
Word Count
61The greater part- of the. formation work on the Western Mutt Road is completed, and the abutment formation of the traffic bridge is wdl ahead. As- the photograph' shows, the junction between .the new and the old road will be at a point about half a mile north of the Silverstream railway overbridge, where the river is comparatively; ■ 1;*: – JF^ s^ Evening Post, Volume CXXIV, Issue 50, 27 August 1937, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.