Article image
Article image
Article image
Article image

PRICES OF METALS

(By Telegraph—Press Assu.—Copyright.) (Received July 16, 11 a.m.) LONDON, July 15. The official London (middle) quotations, as reported by the Australian Mines and Metals Association, conpare with those previously cabled as follows:— July 14. July 15. •Per ton. Per ton. £ s. d. £ s. d. Copper— -- Standard, spot 55 12 6 55 5 0 Ditto, forward 55 15 7 A 55 11 3 Electrolytic .. 62 (I 0" 61 0 0 to 63 5 0 G3 0 0 Wire bars ... G3 5 0 63 0 0 LeadSpot 24 16 10J 24 8 9 Forward 24 11 10J 24 4 4J SpelterSpot 23 0 7J 22 16 10h Forward 23 4 4J 23 0 7-i TinSpot 266 17 6 267 17 G Forward 26S 15 0 265 17 l> SilverStandard, per oz 20d 10 15-l6d Fine 21 9-16d ' 21id

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19370716.2.152.3

Bibliographic details

Evening Post, Volume CXXIV, Issue 14, 16 July 1937, Page 11

Word Count
139

PRICES OF METALS Evening Post, Volume CXXIV, Issue 14, 16 July 1937, Page 11

PRICES OF METALS Evening Post, Volume CXXIV, Issue 14, 16 July 1937, Page 11