Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

METAL PRICES

FURTHER SHARP ADVANCES

(Br Teleeraph—Press Assn.—Copyrlßht.) v (Received March 11, i.30 p.m.)

LONDON, March 10.

The official London (middle) quotations, as reported by the Australian Mines and Metals Association, compare with those previously cabled as follows:—

Mar. 9. Mar. 10. Per ton. Per ton. £ s. d. £ s. d. CopperStandard, spot 73 1 3 77 6 3 Ditto, forward . 71 13 9 74 18 9 Electrolytic .. 77 0 0 79 0 0 to 77 10. 0 ■ 80 0 0 Wire bars .... 77 10 0 " . 80 0 0 Lead— Spot 34 12 6 36 0 0 Forward 34 11 3 35 13 9 Spelter— Spot 35 -8 9 36 5 0 Forward 35 12 6 36 5 0 TinSpot 276 15 0 300 5 0 Forward 275 17 6 296. 10 0 SilverStandard, per oz 20 7-16d 20 7-16d , Fine 22 l-16d 22 l-16d -

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19370311.2.150.3

Bibliographic details

Evening Post, Volume CXXIII, Issue 59, 11 March 1937, Page 11

Word Count
144

METAL PRICES Evening Post, Volume CXXIII, Issue 59, 11 March 1937, Page 11

METAL PRICES Evening Post, Volume CXXIII, Issue 59, 11 March 1937, Page 11