Article image
Article image
Article image
Article image
Article image
Article image

MINING NEWS

BIG RIVER REPORT

The Big River Gold Mines, Ltd., report for the week ended November 23 states: —No. 4 Level—South stope: Filling in is now in progress, and a new stope will be started in two days' time. Centre Stope: Work proceeding on the hanging wall leader with a face now showing a number of narrow seams of quartz. No. 5 Level —Advanced 21ft for the week, making 311 ft from the main shaft. The last 12ft have been through reef track, which shows seams of quartz carrying free gold. The hanging ' wall is not yet in hand. A new winding rope has been installed in the south compartment of the main shaft, and the winding cage in the same compartment has been changed for a re-conditioned one. Twenty-six tons of storie were raised.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19361130.2.160.9

Bibliographic details

Evening Post, Volume CXXII, Issue 131, 30 November 1936, Page 12

Word Count
136

MINING NEWS Evening Post, Volume CXXII, Issue 131, 30 November 1936, Page 12

MINING NEWS Evening Post, Volume CXXII, Issue 131, 30 November 1936, Page 12