Article image
Article image
Article image
Article image

"Evening Post" Fhpto, SPANNING A HARBOUR.— A view of the Paremata-Plimmerton bridge across the entrance to.the northern arm of Porirua Harbour show ihg the final stages.of the work which will link the bridge with the abutment on the Plimmerton side.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19360602.2.47.1

Bibliographic details

Evening Post, Volume CXXI, Issue 129, 2 June 1936, Page 7

Word Count
40

"Evening Post" Fhpto, SPANNING A HARBOUR.—A view of the Paremata-Plimmerton bridge across the entrance to.the northern arm of Porirua Harbour show ihg the final stages.of the work which will link the bridge with the abutment on the Plimmerton side. Evening Post, Volume CXXI, Issue 129, 2 June 1936, Page 7

"Evening Post" Fhpto, SPANNING A HARBOUR.—A view of the Paremata-Plimmerton bridge across the entrance to.the northern arm of Porirua Harbour show ihg the final stages.of the work which will link the bridge with the abutment on the Plimmerton side. Evening Post, Volume CXXI, Issue 129, 2 June 1936, Page 7