Article image
Article image
Article image
Article image

MINING AND DREDGING

TALISMAN DTJBBO. J Talisman Dubbo Gold Mines, Ltd., i reports that 45 1-3 tons ■of ore was ; treated at the Golden Dawn ■ battery i for an approximate realisation of £371). j

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19360516.2.120.3

Bibliographic details

Evening Post, Volume CXXI, Issue 115, 16 May 1936, Page 12

Word Count
34

MINING AND DREDGING Evening Post, Volume CXXI, Issue 115, 16 May 1936, Page 12

MINING AND DREDGING Evening Post, Volume CXXI, Issue 115, 16 May 1936, Page 12