Article image
Article image
Article image
Article image

MOUNT LYELL.

The Mount Lyell Mining and Railway Co., Ltd., gives the following report for the fortnight ended January 22-—North Mount Lyell Mine: Tons extracted, 4549; 1300 ft level, No. 3 rise to 91ft through mineralised schist. Crown -Lyell Mine: Tons extracted, 393. Royal Thai-sis Mine: Tons extracted, 3428. No. 6 level, transfer pass crosscut to 39ft, through low-grade ore. West Lyell Mine: Tons extracted, 13,691. Prince Lyell Mine: Tons extracted, 73. Lyell Comstock Mine: Tons extracted, 3430. No. 4 level, No. 2 mullock drive to 55ft, through mineralised schist. No. 7 level, main shaft to 366 ft through micaceous quartzite. Reduction works: Furnace in blast 8 days of period; 3170 tons refinery anodes made for current year. Concentrator: Mill operated 336 hours and treated 25,078 tons ore, producing 1845 tons concentrates. Copper refinery: Tank house in operation throughout fortnight, 505 tons cathode copper being produced for the period. Total for current year, 4128 tons.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19360204.2.136.16

Bibliographic details

Evening Post, Volume CXXI, Issue 29, 4 February 1936, Page 12

Word Count
155

MOUNT LYELL. Evening Post, Volume CXXI, Issue 29, 4 February 1936, Page 12

MOUNT LYELL. Evening Post, Volume CXXI, Issue 29, 4 February 1936, Page 12