Article image
Article image
Article image
Article image
Article image
Article image

TEST OF AIR ENGINES

(British Official Wireless.)

BTJGBY, 17th September. The Aeronautical Inspection Directorate, having made experimeatal tests which have proved satisfactory, the Air Ministry^ has extended the time between overhauls for Bolls Boyee Kestrel engines fitted to Boyal,Air Forco aircraft by 100 flying hours and the time in future between overhauls .will be 500 hours, equivalent tto ■ 75,000 mile's. .■ ~'['■. .; . .

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19320919.2.121.7

Bibliographic details

Evening Post, Volume CXIV, Issue 69, 19 September 1932, Page 8

Word Count
60

TEST OF AIR ENGINES Evening Post, Volume CXIV, Issue 69, 19 September 1932, Page 8

TEST OF AIR ENGINES Evening Post, Volume CXIV, Issue 69, 19 September 1932, Page 8