TEST OF AIR ENGINES
(British Official Wireless.)
BTJGBY, 17th September. The Aeronautical Inspection Directorate, having made experimeatal tests which have proved satisfactory, the Air Ministry^ has extended the time between overhauls for Bolls Boyee Kestrel engines fitted to Boyal,Air Forco aircraft by 100 flying hours and the time in future between overhauls .will be 500 hours, equivalent tto ■ 75,000 mile's. .■ ~'['■. .; . .
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19320919.2.121.7
Bibliographic details
Evening Post, Volume CXIV, Issue 69, 19 September 1932, Page 8
Word Count
60TEST OF AIR ENGINES Evening Post, Volume CXIV, Issue 69, 19 September 1932, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.