F^^AIJSfRALIAN SERyiCE.-The new Orontes, the last of the jwv2osQo4on, steamers of the Orient Line's. 1924 building programme,'which was recently completed .by Messrs. Vickers-Arin-sfrmgs.: The Orontes is a twin screw geared turbine steamer 6Q4fl .-"'""'"■• ,-■■' in length, tvith a beam of 75ft.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19291116.2.234.2
Bibliographic details
Evening Post, Volume CVIII, Issue 120, 16 November 1929, Page 32
Word Count
40F^^AIJSfRALIAN SERyiCE.-The new Orontes, the last of the jwv2osQo4on,steamers of the Orient Line's. 1924 building programme,'which was recently completed .by Messrs. Vickers-Arinsfrmgs.: The Orontes is a twin screw geared turbine steamer 6Q4fl .-"'""'"■• ,-■■' in length, tvith a beam of 75ft. Evening Post, Volume CVIII, Issue 120, 16 November 1929, Page 32
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.