Article image
Article image

Lnder Beu Nevis, Britain's highest jnountam, now runs a tunnel 13 miles Jong and 15ft in diameter, through which water will rush to give power for a huge mew aluminium factory.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19291102.2.196

Bibliographic details

Evening Post, Volume CVIII, Issue 108, 2 November 1929, Page 31

Word Count
31

Untitled Evening Post, Volume CVIII, Issue 108, 2 November 1929, Page 31

Untitled Evening Post, Volume CVIII, Issue 108, 2 November 1929, Page 31