Article image
Article image
Article image
Article image
Article image
Article image

WATER FOR GISBORNE

(By Telegraph.—Press Association.)

GISBOBNE, This Day. Proposals for the augmentation of the Gisborno water supply were presented to the Borough Council last evening in a report by Mr. Leslie H. Eeynolds, in collaboration with the municipal engineer, Mr. A. Young. Alternative schemes were submitted. The first embraced a supplementary supply of underground water from Matawhero and a special service reservoir, the total cost being £49,730. The second proposed the construction of a new reservoir at To Arai headworks, to increase the discharge capacity of the present main and service reservoir. The total cost of this^Tvouia be £108,670,

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19270209.2.50

Bibliographic details

Evening Post, Volume CXII, Issue 33, 9 February 1927, Page 8

Word Count
100

WATER FOR GISBORNE Evening Post, Volume CXII, Issue 33, 9 February 1927, Page 8

WATER FOR GISBORNE Evening Post, Volume CXII, Issue 33, 9 February 1927, Page 8