Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

LIGHT AND HEAT

GIGANTIC GERMAN SCHEME

ELIMINATING BRITISH COAL.

(United Press Association.—Copyright.) COLOGNE, 27th November.

A gigantic scheme for the supply of the whole of Germany with light and heat from tho Ruhr has been successfully inaugurated at Essen. It consists of the construction of a huge pipe system between Hamborn and Ham in order to collect gas west to east across the Ruhr from tho intervening collieries. This central conduit system will bo connected with every German town; even as far apart as Hamburg and Munich. British gas coal will n:i longer be needed at Hamburg, ". hero it .always undersold German. The scheme will take four or five years to carry out.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19261129.2.52

Bibliographic details

Evening Post, Volume CXII, Issue 130, 29 November 1926, Page 9

Word Count
113

LIGHT AND HEAT Evening Post, Volume CXII, Issue 130, 29 November 1926, Page 9

LIGHT AND HEAT Evening Post, Volume CXII, Issue 130, 29 November 1926, Page 9