Article image
Article image
Article image
Article image
Article image
Article image

NGAKAWA SCHOOL

ARRANGEMENTS FOR REI3QILD

. In connectjorv with, the recent firo at the Isgakawa Girls' Diocesan School at Morton,, it is announced that plans are now being prepared for the re-erdction of the main building in. brick at a cost of from £15,000 to £20,000,* and that it w hoped to lay the foundation-stone of tlie now building■ within, a month's time. The old mam building, which was completely destroyed, was insured for £7500 and the contents for £3000, besides which the pupils' effects were- covered by a policy of £1500. A .number of smaller outbuildings, all of which were old, were also destroyed, but were covered to a certain extent by additional insmance. The Board of Governors statvs that two neighbouring hous> have beea secured which", with the remaining buildings, will enable the school .work to. bo carried on,without interruption. ■•.'. ,

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19240911.2.62

Bibliographic details

Evening Post, Volume CVIII, Issue 63, 11 September 1924, Page 6

Word Count
141

NGAKAWA SCHOOL Evening Post, Volume CVIII, Issue 63, 11 September 1924, Page 6

NGAKAWA SCHOOL Evening Post, Volume CVIII, Issue 63, 11 September 1924, Page 6