Article image
Article image
Article image
Article image

NORTHLAND TUNNEL

Bad going is still the rnlo at' the Northland tunnel, not bad going as' a result of bad workmanship, but a result of the greasy and treacherous nature of the ground t through which the bore is being niade._ Special timbering is ra■quircd, for in such country no chances may bo taken. Tlie working faco is'now übuut sixty feet in hvm "the starting WUil, ■,-'■■ ..-.•.- -:. ' ' ■-

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19240902.2.64

Bibliographic details

Evening Post, Volume CVIII, Issue 55, 2 September 1924, Page 7

Word Count
66

NORTHLAND TUNNEL Evening Post, Volume CVIII, Issue 55, 2 September 1924, Page 7

NORTHLAND TUNNEL Evening Post, Volume CVIII, Issue 55, 2 September 1924, Page 7