Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

DISMANTLING THE TOMB

OPERATIONS AT LUXOR.

(UNITID FKIU A)IOCUT!O!f.— COPTSIOIT.)

CSTDNEY SDH CABLB.) tv j- LUXOR, 23rd January. .The dismantling of the outer shrine of the tomb is completed. The fourteen sections, have been packed in cottonwool to preserve the fragile gilding without mishap. The second shrine will be tackled to-morrow. More rapid pro r gress in future operations is anticipated.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19240125.2.75

Bibliographic details

Evening Post, Volume CVII, Issue 21, 25 January 1924, Page 7

Word Count
61

DISMANTLING THE TOMB Evening Post, Volume CVII, Issue 21, 25 January 1924, Page 7

DISMANTLING THE TOMB Evening Post, Volume CVII, Issue 21, 25 January 1924, Page 7