Article image
Article image
Article image
Article image
Article image
Article image

THE PORT ELLIOT

(BI TELEGRAPH—PKBBS ASSOCIATION.)

GISBORNE, This Day. Salvage operations at the Port Elliot have been suspended since Sunday, owing to the weather. ' The sea has'beeri moderate to heavy, and has" prevented the. lightering of the cargo, though it is not affecting the stranded vessel.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19240124.2.55

Bibliographic details

Evening Post, Volume CVII, Issue 20, 24 January 1924, Page 6

Word Count
46

THE PORT ELLIOT Evening Post, Volume CVII, Issue 20, 24 January 1924, Page 6

THE PORT ELLIOT Evening Post, Volume CVII, Issue 20, 24 January 1924, Page 6