Article image
Article image
Article image
Article image

TIMARU ALSO AFFECTED

TIMARU, 10th December. Lake Coleridge electric power, which was switched on to Timaru on Stnday caused trouble to-day. The intermittent supply during the day resulted in the borough electrical engineer reverting to his own supply and deciding to maintain the same till Sunday next.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19231211.2.71.2

Bibliographic details

Evening Post, Volume CVI, Issue 140, 11 December 1923, Page 8

Word Count
47

TIMARU ALSO AFFECTED Evening Post, Volume CVI, Issue 140, 11 December 1923, Page 8

TIMARU ALSO AFFECTED Evening Post, Volume CVI, Issue 140, 11 December 1923, Page 8