PANORAMA OF SITE OF ARAPETI DAM SHOWING. FROM LEFT TO MIGHT. THE PROGRESS OF THE EXCAVATION OF THE FOUNDATIONS FOR THE DAM; THE TRAM LINE CONNECTING WITH THE TUNNF.L TO THE MANGAHW DAf«; THE STONE-CRUSHING PLANT; HOUSES OF ST.'jFF; WHILE ON THE EXTREME RIGHT IS THE TfiAMWAY TO THE TUNNEL CON N ECTING WITH THE HEADtyORKS OF THE PIPE UNE TO THE POWER HOUSE, THE WHITE LINE TO THE UIFT INDICATES THE EXTENT OF THE FOUNDATIONS REQUIRED FQB THE FOUNDATIONS OF THE DAW, "
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19231031.2.90.3
Bibliographic details
Evening Post, Volume CVI, Issue 105, 31 October 1923, Page 11
Word Count
83PANORAMA OF SITE OF ARAPETI DAM SHOWING. FROM LEFT TO MIGHT. THE PROGRESS OF THE EXCAVATION OF THE FOUNDATIONS FOR THE DAM; THE TRAM LINE CONNECTING WITH THE TUNNF.L TO THE MANGAHW DAf«; THE STONE-CRUSHING PLANT; HOUSES OF ST.'jFF; WHILE ON THE EXTREME RIGHT IS THE TfiAMWAY TO THE TUNNEL CON N ECTING WITH THE HEADtyORKS OF THE PIPE UNE TO THE POWER HOUSE, THE WHITE LINE TO THE UIFT INDICATES THE EXTENT OF THE FOUNDATIONS REQUIRED FQB THE FOUNDATIONS OF THE DAW, " Evening Post, Volume CVI, Issue 105, 31 October 1923, Page 11
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.