THE COLOSSEUM RINK.
Owing to the continuous wet weather, work has been seriously hampered at the Colosseum. There is considerable outside work to be done before the opeiiing can take place, but the inside work is proceeding speedily, and the management now anticipates that the opening date will be Wednesday, 16th May.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19230510.2.30.8
Bibliographic details
Evening Post, Volume CV, Issue 110, 10 May 1923, Page 5
Word Count
52THE COLOSSEUM RINK. Evening Post, Volume CV, Issue 110, 10 May 1923, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.