Article image
Article image
Article image
Article image

KHANDALLAH SWIMMING BATH

For some considerable time the executive of the KhandaJtah Progressive Association has had in hand the project of constructing a swimming bath for the u» of the residents of the district. Numerous sites have been under consideration] some of which have been inspected by Councillor J. M, Dale and Mr. W. H. Morton. City Engineer, both of whom have dieplayed ■ considerable interest ii: iiie mutter. ' '_ f' "The ladies, of the district v«ry, kindly arranged several function*, which resulted in a substantial sum being raised for tho' purpose indicated. It was hoped that it would haye been po««iWe to have proceeded with tho scheme, at least to the extent of providing a pool for the use o£ tho boys durinß the recent- vacation, but unexpected difficulties aroso which mad« this impossible. . ( Another .axceileni-. siw» has now been proposed, and the', special committee appointed to report "is full? investigating, and hope to be able to bring forward definite proposals at. the MS* monthly meeting of the' executive.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19220328.2.119

Bibliographic details

Evening Post, Volume CIII, Issue 73, 28 March 1922, Page 8

Word Count
168

KHANDALLAH SWIMMING BATH Evening Post, Volume CIII, Issue 73, 28 March 1922, Page 8

KHANDALLAH SWIMMING BATH Evening Post, Volume CIII, Issue 73, 28 March 1922, Page 8