PETONE SEWERAGE SYSTEM
;: ,Work" in „' connection, with the Jast stages of- the -Petone -sewerage-system are now in progress, and Richmond and Britannia streets are being reticulated.. Up to date, 637 permits to connect with the system have been issued. The totaj cost of the work so far is £63,735. 6s 6d, the principal items in which are : —Wages £27,293 8s Id, material £16,550 13« lid, electrical plant £9241 6a lid/interest and sinking fund £3492 12s sd, cartage £2353 17s 6d, plant £1688 15e 6d,and engineering expenses £1510 5s 3d. ,
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19170918.2.84
Bibliographic details
Evening Post, Volume XCIV, Issue 68, 18 September 1917, Page 8
Word Count
89PETONE SEWERAGE SYSTEM Evening Post, Volume XCIV, Issue 68, 18 September 1917, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.