MINING NEWS
TALISMAN CONSOLIDATED. * , The mine superintendent of the Talisman Consolidated reports having sent to London the following cablegram: — 'Woodstock, south, drive, progress 55ft ; No. 4 crosscut, driving north — progress 69ft; No. 15 level, south progress 13ft; reef, 24in wide ; values nil ; north drive — progress 48ft; reef. 63in\vide 3 value £6 7s 6d. Reef faulted.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19150625.2.38
Bibliographic details
Evening Post, Volume LXXXIX, Issue 149, 25 June 1915, Page 4
Word Count
55MINING NEWS Evening Post, Volume LXXXIX, Issue 149, 25 June 1915, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.