Article image
Article image
Article image
Article image

PETROLEUM

[BX TELEGRAPH — SPECIAL TO THX KMT J NEW, PLYMOUTH, This Day. , The manager of the petroleum works at Moturoa reports that good progress was made yesterday at No. 1 bore, where deepening operations are being carried out. Bores No. 2, 3, and 5 are flowing as usual.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19120629.2.92

Bibliographic details

Evening Post, Volume LXXXIII, Issue 154, 29 June 1912, Page 11

Word Count
48

PETROLEUM Evening Post, Volume LXXXIII, Issue 154, 29 June 1912, Page 11

PETROLEUM Evening Post, Volume LXXXIII, Issue 154, 29 June 1912, Page 11