Article image
Article image
Article image
Article image
Article image
Article image

PASSENGERS DELAYED

Electric Train Breaks Down

An interruption to the Johnsonville railway service occurred last night when the B.S p.m. multiple-unit from Wellington developed technical trouble and could proceed no further than the Wadestown crossing loop. A down train towed the crippled unit back to Wellington, and normal running was resumed at 9.23 p.m. Passengers stranded between Wellington and Johnsonville were taken to the city by a special bus. An accumulation of Friday night shoppers at Wellington necessitated the running of a four-car train instead of the usual two-car unit at 9.23 p.m.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19440219.2.91

Bibliographic details

Dominion, Volume 37, Issue 123, 19 February 1944, Page 8

Word Count
93

PASSENGERS DELAYED Dominion, Volume 37, Issue 123, 19 February 1944, Page 8

PASSENGERS DELAYED Dominion, Volume 37, Issue 123, 19 February 1944, Page 8