Article image
Article image
Article image
Article image
Article image
Article image

ITALIAN REPORTS

(Received December 29, 7.5 p.m.) LONDON, December 28. A communique issued in Rome si a les: — ■■There is artillery activity on the Bardia front. One of our lightning columns in conjunction with the air force destroyed an enemy mechanized detachment and captured the crews. “On the Greek front enemy Mittacks were repulsed and some prisoners taken. Bombers and fighters continued to attack troops, installations and road junctions and bombed the enemy naval base at Prevesa. scoring a direct lilt on a ship. ■'One of our submarines operating in llie Atlantic has not: returned.’’ LONDON, December 27.

An Italian communique reports that artillery and patrol action continues on both sides of the Libyan frontier zone. 'Pho Italian tiir force is stated to be very active, and bombed ships in the bay of an advanced enemy base, and also enemy batteries and mechanized forces.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19401230.2.75

Bibliographic details

Dominion, Volume 34, Issue 81, 30 December 1940, Page 7

Word Count
144

ITALIAN REPORTS Dominion, Volume 34, Issue 81, 30 December 1940, Page 7

ITALIAN REPORTS Dominion, Volume 34, Issue 81, 30 December 1940, Page 7