Tar-sealing operations on the main south highway in the vicinity of Te will be started next week. The length of road to receive attention, which is situated between Otane and the Hawke’s Bay county boundary, is four miles and a half. .
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19380312.2.113
Bibliographic details
Dominion, Volume 31, Issue 142, 12 March 1938, Page 15
Word Count
41Untitled Dominion, Volume 31, Issue 142, 12 March 1938, Page 15
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.