Article image
Article image
Article image
Article image

The formation of the earthwork of the approach to the traffic overbridge Linder construction at Paraparaumu is progressing steadily, as this picture shows.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19371113.2.54.4

Bibliographic details

Dominion, Volume 31, Issue 42, 13 November 1937, Page 9

Word Count
23

The formation of the earthwork of the approach to the traffic overbridge Linder construction at Paraparaumu is progressing steadily, as this picture shows. Dominion, Volume 31, Issue 42, 13 November 1937, Page 9

The formation of the earthwork of the approach to the traffic overbridge Linder construction at Paraparaumu is progressing steadily, as this picture shows. Dominion, Volume 31, Issue 42, 13 November 1937, Page 9