Article image
Article image
Article image
Article image

WAR ON NOISE

London Tube Railways t (British Official Wireless. I (Received February 5, 5.5 p.m.) Rugby, February 4. Noise in London tube railways is to be reduced by half at an estimated cost of £lOO,OOO. Experiments for the reduction of the wheel-on-rail noise are now reported to be complete and all rail sections on 440 track miles of the system and on all planned extensions are to be welded by special process. A final solution of the second half of the noise problem—that of absorbing as much as possible of the noise that is produced—has not yet been reached. Experiments have been made in a section of tube with asbestos composition mattresses raised to the height of the floor of the train along the tunnel walls. For a number of reasons, however, they have been found unsatisfactory and experiments with other materials are to continue.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19370206.2.35

Bibliographic details

Dominion, Volume 30, Issue 113, 6 February 1937, Page 9

Word Count
146

WAR ON NOISE Dominion, Volume 30, Issue 113, 6 February 1937, Page 9

WAR ON NOISE Dominion, Volume 30, Issue 113, 6 February 1937, Page 9