Article image
Article image
Article image
Article image

Rail-car Trials.— During the week-end the shop trials of the first of the rail-cars built at the Railway Workshops, in the Hutt Valley, will be made over sections of the main lines between Wellington, Palmerston North, and the Wairarapa, including a climb over the Rimutaka incline. Above is a picture showing one or the cars in course of construction in the workshops.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19360530.2.62.4

Bibliographic details

Dominion, Volume 29, Issue 208, 30 May 1936, Page 9

Word Count
62

Rail-car Trials.—During the week-end the shop trials of the first of the rail-cars built at the Railway Workshops, in the Hutt Valley, will be made over sections of the main lines between Wellington, Palmerston North, and the Wairarapa, including a climb over the Rimutaka incline. Above is a picture showing one or the cars in course of construction in the workshops. Dominion, Volume 29, Issue 208, 30 May 1936, Page 9

Rail-car Trials.—During the week-end the shop trials of the first of the rail-cars built at the Railway Workshops, in the Hutt Valley, will be made over sections of the main lines between Wellington, Palmerston North, and the Wairarapa, including a climb over the Rimutaka incline. Above is a picture showing one or the cars in course of construction in the workshops. Dominion, Volume 29, Issue 208, 30 May 1936, Page 9