Article image
Article image
Article image
Article image

Whirokino Road Deviation.— Work has commenced on the deviation which will eliminate the frequently-flooded Moutoa Swamp section of the Wellington-New Plymouth highway (shown left). Th is section will be cut out when the new road, which will run direct from Foxton, is completed. Kight: A Public Works Department gang starting work on the new road at Foxton.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19360516.2.51.1

Bibliographic details

Dominion, Volume 29, Issue 196, 16 May 1936, Page 9

Word Count
57

Whirokino Road Deviation.—Work has commenced on the deviation which will eliminate the frequently-flooded Moutoa Swamp section of the Wellington-New Plymouth highway (shown left). This section will be cut out when the new road, which will run direct from Foxton, is completed. Kight: A Public Works Department gang starting work on the new road at Foxton. Dominion, Volume 29, Issue 196, 16 May 1936, Page 9

Whirokino Road Deviation.—Work has commenced on the deviation which will eliminate the frequently-flooded Moutoa Swamp section of the Wellington-New Plymouth highway (shown left). This section will be cut out when the new road, which will run direct from Foxton, is completed. Kight: A Public Works Department gang starting work on the new road at Foxton. Dominion, Volume 29, Issue 196, 16 May 1936, Page 9